ASRY’s variety of facilities, from graving dock to floating dock, to slipways, to 5km of alongside berth space, means maximum flexibility in accommodating ship schedules.
Every major repair sub-contractor, classification society, and specialist workshop has an on-site presence at ASRY so that any repair requirements can be met without delay.
Drydock Facilities | Length | Breadth | Draught |
---|---|---|---|
Graving Dock |
375m | 75m | 8.5m |
Floating Dock (Max lift 33,000t) |
252m | 44m | - |
Floating Dock (Max lift 30,000t) |
227m | 40m | - |
375m
75m
8.5m
252m
44m
-
227m
40m
-
Slipway Facilities | Length | Breadth | DWT |
---|---|---|---|
x2 Slipways |
255m | - | - |
255m
-
-
Berthing Facilities | Length | Breadth | Draught |
---|---|---|---|
Repair Berths |
5000m | - | - |
5000m
-
-
Please get in touch, we’d be happy to discuss your requirements